How to price a painting job: a worked 4-room bid

By Mike Ventrella8 min read

A cut-paper illustration of a painting contractor with a clipboard measuring a living room wall with a tape while a painter on a step ladder brushes the window trim.

To price a painting job, measure the surfaces you'll paint, turn them into crew hours and gallons, and add up what those hours and gallons cost you. Then divide that cost by one minus your target gross margin. In the 4-room example below, $2,220 of labor and paint becomes a $4,440 bid at a 50% margin. Square foot, hourly and per-room prices are three ways to show the customer that one number.

If you run a painting company, every input is already on your payroll report and your P&L. The rest is measuring the right surfaces and timing your own crews.

Square foot, hourly or per room?

Quote the way your customers buy, but build every quote from cost. Each method breaks in a predictable place.

Method Works for Where it goes wrong
Per square foot Repaints, new construction, exteriors Floor area and wall area are different numbers, and neither one sees prep
Hourly (time and materials) Touch-ups, repairs, scope you can't see yet A slow crew earns you more, and the customer watches the clock
Per room Interior repaints with standard rooms A 9-foot living room with 3 windows isn't a 12 by 12 bedroom

Underneath all three is your production rate: the square feet of wall, or linear feet of trim, one painter finishes in an hour. Time your crews on real jobs and write the rates down.

What does a painting job cost you?

Two things: labor and materials.

Labor is the big one. The median painter earned $23.75 an hour in 2025, according to the Bureau of Labor Statistics. Payroll taxes, workers' comp, benefits and paid time off added about a third in our labor burden example, which puts that painter near $31.50 for every hour on the clock.

Not every paid hour lands on a job. Paint store runs, loading the van and the trip back for touch-ups all get paid. If about 5 of every 6 paid hours land on a job, each crew hour on a job, one painter for one hour, costs you about $38.

Materials are paint plus sundries. Sherwin-Williams says a gallon typically covers about 350 to 400 square feet, and wall texture changes how far it goes. Count that as one coat, and use the low end on rough walls. Sundries are the tape, plastic, caulk, patch, sandpaper and roller covers that every job eats.

A worked 4-room bid

The job: a living room, 16 by 20 with 9-foot ceilings, and 3 bedrooms, each 12 by 12 with 8-foot ceilings. Walls get two coats, baseboards and door and window casings get painted, and ceilings aren't included. The production rates, paint price and margin are examples. Use your own.

Start by measuring walls, not floors. Wall area is the room's perimeter times its height, minus doors and windows. The living room's 648 square feet of wall drops to 600 once the door and windows come out, and each bedroom's 384 drops to 320.

Room Wall area Floor area
Living room 600 sq ft 320 sq ft
3 bedrooms 960 sq ft 432 sq ft
Total 1,560 sq ft 752 sq ft

Then turn the measurements into hours and gallons.

Line Basis Amount
Prep: move furniture, fill holes, caulk, mask 4 rooms, light prep 8 hours
Walls, two coats 3,120 sq ft ÷ 175 sq ft an hour 18 hours
Trim, two coats 360 linear ft ÷ 36 ft an hour, both coats 10 hours
Setup and cleanup 2 painters, 2 hours each 4 hours
Crew hours 40
Labor 40 hours × $38 $1,520
Paint 9 gallons for walls, 2 for trim, at $50 $550
Sundries tape, plastic, caulk, patch, covers $150
Job cost $2,220
Price at a 50% margin $2,220 ÷ 0.5 $4,440

That's 2 painters for 2.5 days.

Where does the 50% come from?

Gross margin is what's left of the price after the labor and paint on the job. It has to pay for the estimator, the vans, insurance, marketing and the office, then leave a profit. So the target comes off your P&L: overhead as a share of revenue, plus the net profit you want. If overhead runs 35% and you want 15%, you need 50%.

Divide by one minus the margin instead of adding a markup. A 50% markup on $2,220 is $3,330, which is a 33% margin and $1,110 short on one job. The post on how to price HVAC jobs walks through the difference.

That target only works if your painters' wages sit above the gross margin line, in cost of goods sold. If your P&L lumps them into overhead, or the paint store account never gets reconciled to jobs, you don't have a margin to price from yet. YetiBooks does the books, payroll and taxes in one place, so painter wages and paint store tickets land on the right lines (here's how it works).

What does $4,440 look like per square foot?

The same bid, four ways:

  • $2.85 per square foot of wall ($4,440 ÷ 1,560)
  • $5.90 per square foot of floor ($4,440 ÷ 752)
  • $1,110 per room on average, though the living room holds 38% of the wall area
  • $111 per crew hour ($4,440 ÷ 40)

This is why "$2 a square foot" means nothing until you say which square foot. On this house, $2 a square foot of floor is $1,504, which is below the $2,220 it costs you to do the work. $2 a square foot of wall is $3,120, which covers cost but misses the target by $1,320. Put the measure on the estimate, and set your per-room prices by room size and ceiling height.

How do you price prep and trim?

Prep and trim are where painting bids lose money, because they don't show up in a square-foot number.

Set the prep level at the walk-through and write it on the estimate.

  • Light: fill nail holes, spot prime, mask. This is in the base price.
  • Medium: patch, sand and caulk open gaps. Add 1 to 2 hours a room.
  • Heavy: peeling paint, water stains, a skim coat. Price it as its own line after you see it.

Every hour you add costs $38 and goes on the bid at $76 at a 50% margin.

Price trim by the linear foot or by the piece. At 36 feet an hour, two coats on baseboard cost about $1.06 a foot in labor ($38 ÷ 36), so about $2.10 a foot on the bid before paint. A door, both sides and the jamb, at an hour of crew time plus about $5 of paint, comes to $86. Build those once and reuse them on every estimate.

Does the price fit the crew's day?

Before a bid goes out, divide it by your target revenue per crew hour. That's the time the crew can spend on the job and still hit your numbers. We set up this check for a window cleaning owner who didn't know his crews' revenue per man-hour:

If you have a thousand dollar job and you divide that by 62.50 you need 16 man hours to do that job. … If we're going to put two people on that job it'll be eight hours.

Take the example's $111 a crew hour as the target: $4,440 ÷ $111 is 40 crew hours, so 2 painters get 2.5 days. Now say a salesperson quotes a similar house at $3,000 off a per-room sheet. At $111 an hour that buys 27 crew hours, and the walk-through says 40. The quote is 13 crew hours short, more than a day and a half of one painter's time, before anyone opens a can.

Check it again when the job closes. Our post on bookkeeping for painting contractors shows a repaint that bid at $112.50 a crew hour and finished at $75.

Is your price too low?

Your close rate will tell you. Our target is to close about half of what you bid. A high-end painting contractor closing about 60% of his bids was tempted to discount to win more. We told him to raise his prices and run the math instead:

If you go into just like a Google Sheet and you just do like a quick little formula … I'm right now doing 100 estimates a month. … Those 100 estimates are at an average job size of X dollars. … that results in 60 jobs at X dollars, and then all you do is just increase your prices and your closing ratio drops from 60% to 50% now. And you do the same math.

Here's that math with the example bid. The estimate count and the close rates are examples.

Now After a 15% raise
Estimates a month 30 30
Close rate 60% 50%
Jobs 18 15
Average bid $4,440 $5,106
Revenue $79,920 $76,590
Job cost at $2,220 each $39,960 $33,300
Gross profit $39,960 $43,290
Crew hours 720 600

Fewer jobs and less revenue, but $3,330 more gross profit a month and 120 crew hours back on the schedule. Track the result on each finished job with job costing, so the next bid starts from real production rates.

Questions owners ask

How much should I charge per square foot to paint?

Whatever your cost math gives you, stated against the surface you measured. In the example it's $2.85 per square foot of wall. A rate copied from another market carries that market's wages and overhead, not yours.

How do I price exterior painting?

The same way. Measure the siding and trim, apply your exterior production rates, and add lift or scaffold rental at cost. Exterior prep runs heavier, so walk the whole house before you set the prep level.

Should I charge more for a color change?

Yes, when it adds a coat or primer. Dark red to light gray can need primer plus two coats, so add the extra coat's hours and gallons like any other line.

How often should I update my painting prices?

Every January, when payroll costs reset, and whenever you give raises or the paint store changes your contractor pricing.

Get more of every painting bid to the bottom line

Before the next bid goes out, build it from your own production rates and crew-hour cost, then check it against your target revenue per crew hour. On the example house, that check is the difference between a $4,440 bid that earns $2,220 of gross profit and a $3,000 quote that leaves the crew 13 hours short. If your P&L doesn't show painter wages above the gross margin line yet, book a free profit call and we'll look at whether your books show the margin you're pricing to.

Keep reading

See every article
  • HVAC flat rate pricing: the math behind the book

    Each HVAC flat rate price is book time times your cost per billable hour, plus parts, divided by one minus your margin. Here's how to check a book.

  • Plumbing pricing: how to price plumbing jobs

    Plumbing pricing starts with what one billable hour of a plumber and a truck costs you. Here's the math, flat rate vs T&M, trip fees and after-hours rates.

  • How to price electrical work

    Price electrical work from one billable-hour rate: labor, overhead and profit per hour you invoice. Here's the math on a panel upgrade and an EV charger.